You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Current »

Model labels: 14506000_10-16_chunk:1, PR2MountAssby:1, 14506000_10-16_chunk:2, PR2MountAssby:2, PR3Mount_littleAssby, PR3Mount_BigAssby, 14163100 9-25_PR3_chunk 

Assembly instructions

 

 

 

 

 

Mounting the large relays 1, 2, and 3

Overview: The relays are mounted using spring-loaded clamps. This is to avoid exerting undue pressure on the Al tubes and optics.
The screws need to be in a narrow range. 
Relays 1 & 2 require 1.5" 1/4 20 socket screws
Relays 3 requires 2.5" 1/4 20 socket screws
Mount as shown in the photos


Left, mounts for relays 1 & 2. Right, relay 3
  • No labels